Watching is the one thing here that needs an account, because an alert needs somewhere to go. Everything else on this page works signed out.
Open on the registrar (opens in a new tab)- Status
- Open
- Restrictions read 21 hours ago.
- Enrolled
- 21 of 25
- 84% full
- Read 10 minutes ago, and the registrar publishes once an hour, so this is current.
- Waitlist
- No waitlist
- Seat risk
- medium risk
From the registrar limited to
Selected Music Industry courses are limited to department majors and minors on the first enrollment pass. Restrictions may be lifted after the start of the second pass. Non-Music Industry students seeking to enroll should attend the first course meeting to request PTE. Unless by instructor consent, no PTEs are issued before the start of the quarter. Seats are held for entering students who enroll through New Student Orientation sessions beginning July 2, 2026. New student restrictions will be lifted on September 15, 2026 at 8 a.m.
The limit applies to the earlier enrollment pass. Dibs still counts this class as one you can take, because it opens up, but on first pass it may not be yours yet. This class is also Juniors and Above, and Music Industry Majors or Minors or Music History and Industry Majors Only, and New Transfers Only, which the pass does not lift.
When it meets
Meets: R 9:00am-11:50am
Schoenberg Music Building 1343
Predicted GPA
More about MSC IND 134, though its grade history is empty too.
What students say
Dibs measures outcomes: grades, seats, how fast it fills. For what the class is actually like to sit in, BruinWalk has the reviews.
Enrollment over time
A dot is a reading where something moved: the seat count, the status, or the waitlist. The last one is the most recent sweep, moved or not. The line holds flat between dots because that is what the readings say: it did not drift, it held and then jumped. The ticks along the bottom are the hours Dibs recorded reading this section, which is how a flat run says "checked, unchanged" rather than "nobody looked". It only keeps those from 25 August, so the ruler is shorter than the line for now. Both start when Dibs did rather than reaching back before it existed.
Filled by 1 over 10 days
Show the readings
| Recorded | Enrolled | Capacity | Status | Waitlist |
|---|---|---|---|---|
| 29 Aug 08:41 | 21 | 25 | open | - |
| 21 Aug 23:40 | 21 | 25 | open | - |
| 21 Aug 10:40 | 20 | 25 | open | - |
| 18 Aug 22:40 | 20 | 24 | open | - |